Project details
BBAC Project
The MRA II Plant is the second phase project of BBAC rear-drive plant, with newly increased annual production capacity of 100,000 vehicles. Its main products are Mercedes-Benz GLC, etc. It was completed and put into operation in October 2015.
Daimler China R&D Center, a joint venture between BBAC and Daimler Greater China Ltd. (DGRC), is one of Daimler's three major R&D Centers worldwide, and is an important pillar of Daimler's global R&D strategy. This project located in the MRA Plant, currently under construction and supposed to be completed in 2020.
关键词:
Category:
Automobile
咨询热线:
BBAC Project
图文详情
The MRA II Plant is the second phase project of BBAC rear-drive plant, with newly increased annual production capacity of 100,000 vehicles. Its main products are Mercedes-Benz GLC, etc. It was completed and put into operation in October 2015.
Daimler China R&D Center, a joint venture between BBAC and Daimler Greater China Ltd. (DGRC), is one of Daimler's three major R&D Centers worldwide, and is an important pillar of Daimler's global R&D strategy. This project located in the MRA Plant, currently under construction and supposed to be completed in 2020.
Previous page
Next page
Previous page
SVW Project
Next page