The project is located in Automobile Industry New City, Jimo District, Qingdao, Shandong Province, with the planned overall production capacity of 200,000 finished vehicles and 100,000 sets of KD parts per year. The Phase I project covers an area of about 920 mu, and the total construction area is about 260,000㎡, mainly including Press Shop, Welding Shop, painting shop, General Assembly Shop, Exhibition and Experience Center, Zhihui Center, comprehensive station buildings, etc.

The project is located in Guangzhou, Guangdong Province, covering an area of about 703 mu, with a total construction area of 252,000㎡, and a planned annual production capacity of 230,000 new energy vehicles. The construction includes the complex plant for pressing, paint and general assembly, painting shop, General Assembly Shop, Control Center, office buildings and supporting facilities.

The project is located in Guangzhou, Guangdong Province, covering an area of about 125.9 ha., equivalent to 1888.56 mu in total, and a total construction area of 510,121㎡. It mainly includes Vehicle Body Complex Plant, Painting Shop, General Assembly Shop, Second painting shop, Parts Shop, R&D Center, offices, Canteen, Experience Center, Distribution Shop, etc.

The project is located in Caijiapo Town, Qishan County, Baoji, Shaanxi Province, covering an area of about 857 mu, with a total construction area of about 240,000㎡. The construction includes Welding Shop, painting shop, Painting Shop of Exterior Trimming Parts, Frame Shop, General Assembly Shop, Commissioning Shop, etc. The overall construction scale of the project is 60,000 vehicles per year, of which 40,000 vehicles are planned in the first phase and 20,000 vehicles are increased in the second phase.

< 1...373839...51 >