The project is located on the No. 1 platform of Urumqi Economic and Technological Development Zone (Toutunhe District), Xinjiang Uygur Autonomous Region, covering an area of about 78 mu, with a total construction area of about 34,450㎡. The construction includes General Assembly Shop, Office Building, Departure Center, Gas Station, Solid Waste Station, test tracks, etc.

The project is located in Jiangdong Industrial Park, Xiaoshan District, Hangzhou, Zhejiang Province, covering an area of 747.6 mu, and the total construction area of 254,529.02㎡. Main buildings: Press Shop, painting shop and General Assembly Shop. Other buildings: Welding Shop (remolded), Canteen, Comprehensive Station Shop, Sewage Treatment Station, Solid Waste Station, Oil Depot, Fire Station, Gas Station, Guard Room 7, test tracks, etc.

The project is located in Changshu, Jiangsu Province, and it is planned to, on the basis of Phase I project, renovate part of the existing production line, civil and public works of plants, use the land of the parking lot, green land and public roads in the plant, newly-built the Second General Assembly Shop (covering an area of about 48,400㎡), expand the Welding Shop (covering an area of about 31,100㎡), and renovate part of the supporting facilities of the existing shops in the first phase.

The project is located in Luancheng District, Shijiazhuang, Hebei Province, covering an area of about 404 mu, with a total construction area of about 120,574㎡. The main construction includes 1 Production Complex Plant, 2 Logistics Warehouses, 1 Component Assembly Shop, 1 Trial Production & Test Center Shop, 1 Inspection Shop, 1 R&D Center, 1 Test Center and auxiliary rooms. It can meet the annual output of 50,000 new energy vehicles or new energy vehicle parts production of new energy vehicle enterprises.

< 1...383940...51 >