BYD Automobile Co., Ltd. and AE carried out in-depth cooperation in the field of welding in the four major bases in Shenzhen, Xi'an, Changsha and Changzhou. They undertook BYD automatic main welding line in 2014. From then on, they gradually expanded and deepened the scope of cooperation. At present, AE has successively undertaken bases of BYD Automobile stage-II sub-assembly automatic flexible line, stage-I sub-assembly automatic flexible line, lower car body flexibility, lower car body repair welding line, main welding line, top cover line, car body repair welding line, adjustment line, FDS, EMS, clamp flexibly library, the arc welding station for small parts and other projects. BYD Automobile's best-sellers, Qin, Qin plus, Qin pro, Han, Tang, Song, Song Max, D1, e2 and e3, are all manufactured by using the production lines constructed by AE.

Lynk 09 is the type of high-end brand Lynk 09 put on the market by Geely Auto Group, type code: EX11. AE undertook this project's side wall inner plate flexible line, side wall outer plate flexible line, top cover line, airborne APC and FDS conveying lines. This project covers processes like online punching, spot welding, gluing and CMT Braze+ and devices like cross sliding table, gravity sliding table and ultrasonic gun cleaner. With the great efforts of each member of the project group, this project has proceeded to the trial production phase.

AE undertook projects like ENOVATE Motors Shaoxing Base, Changsha Base side wall inner plate, side wall outer plate, top cover line, main welding line, EMS and other projects. It adopts AE Open Gate to realize the flexible switching of car type, including spot welding, gluing, CMT and other processes.

AE cooperates with Li Xiang Motor, one of the three major vehicle manufacturers, and undertook the full-flexible production line project for X01&X02 car floor of Changzhou Base. The scope of supply covers engine compartment assembly line, rear floor assembly line, front floor assembly line, front wheel casing assembly line, rear floor outer plate line, rear floor framework assembly line, floor assembly line, aerial APC and aerial EMS. The production line is planned to be 40JPH and meets 3-type flexible production on the same line through turntable rotation switching. Wherein, there are processes include spot welding, SPR (self-piercing riveting), gluing, visual conveying and online measurement. Until now, this project has started the equipment mobilization and installation and will proceed to SOP in October 2022.

< 1...373839...70 >