The project is located in Hai'an County, Nantong City, Jiangsu Province, with a planned production capacity of 156,000 tons of castings, a coverage area of about 398 mu and a total construction area of about 127,000 square meters, and the construction contents include the casting shop, the cleaning shop, the material warehouse and the auxiliary supporting facilities. Our company has undertaken the engineering design, project management and EPC of the whole factory for the entire project.

Project Location: It is located with Xinshui 1st Road, Automobile Industry New Town, Jimo District to the east, Jiefang Avenue to the north, Buxi Road to the west and Jiefang 3rd Road to the south. <br> Construction Scale: It occupies a floor area of 892.61 mu, and a total construction area of about 259,800㎡. Design production capacity: 200,000 nos. <br> Estimated Investment: The total investment is about RMB 2.5 billion. <br> Construction Period: 2 years.

The project is located in Nanchang, Jiangxi, covering an area of about 1,516.65 mu, with a total construction area of 437,192.50㎡. The main construction includes complex industrial plants, No. 3 Industrial Plant, No. 4 Industrial Plant, No. 5 Industrial Plant, comprehensive station buildings, etc.

The project is located in Changzhou, Jiangsu, covering an area of about 277 mu, with a total construction area of 161,000㎡ and a planned capacity of 100,000 SUVs. The new buildings include Press Shop, Welding Shop, General Assembly Shop, painting shop and auxiliary facilities.

< 1...363738...51 >