the project includes the supply of conveying equipment and line-edge process equipment in the General Assembly Shop, Cab Assembly Shop and Testing & Commissioning Shop. The production capacity of the General Assembly Shop and the Testing & Commissioning Shop is 10JPH, and the capacity of the Cab Assembly Shop is 20JPH. The project products cover light trucks, medium trucks and heavy trucks. The flexible production is achieved by integrating conveying equipment and line-edge equipment.
the project is constructed according to the goal of "informatization, flexibility, automation and intelligence", and vigorously applies green new technologies to upgrade high-end manufacturing industry. The designed cycle time for double lines is 26.6JPH. For the first time, it adopts the non-contact power supply heavy-load AGV independently developed by AE. Furthermore, it becomes the most technologically advanced General Assembly Shop of CNHTC after it is officially completed in March 2021.
the production capacity is 20,000 units/year, and the products cover heavy, medium, light and mining trucks. In this project, for the first time, the heavy-duty three-dimensional warehouse is used to store the heavy truck solebars; the front assembly technology is used to complete the front and rear axle assembly of heavy trucks; the double heavy-duty AGV is used for chassis assembly of heavy trucks; the heavy-duty AGV is used to complete the cab interior assembly. Among them, the front assembly technology is the first to be used in China. It has been put into production on May 11, 2021.