PRODUCTS CENTER
England General Assembly Shop Conveyor Project of SAIC Volkswagen Anting No. 2 Plant:
the production capacity is 60JPH. The scope of the project includes both new construction and transformation, which has been undergone three line body switching. Through reasonable project management arrangement, the equipment is upgraded without production suspension; the independently developed EMS+VAC system used in the chassis line is applied in the joint venture brand OEMs for the first time;
Category: