The Liuzhou-Hexi Base of SGMW, with annual production capacity of 400,000 vehicles, and the main products including Chevrolet Spark Lechi, Wuling Yangguang, Wuling small whirlwind, etc., was completed and put into operation in November 2003.
The Liuzhou-Baojun Base of SGMW, with annual production capacity of 400,000 vehicles, and the main products including Baojun 560, Baojun 310, Baojun 510, etc., was completed and put into operation in November 2003.
The Qingdao Base of SGMW, with annual production capacity of 500,000 vehicles, and the main products including Wuling Rongguang, Wuling Xingwang, PN series Pickup, etc., was completed and put into operation in July 2005.
The Chongqing Base of SGMW, with annual production capacity of 400,000 vehicles, and the main products including Wuling Hongguang V, Baojun E100, etc., was completed and put into operation in December 2014.
The Indonesia Plant of SGMW, with annual production capacity of 120,000 vehicles, and the main products including Wuling Confero S etc., was completed and put into operation in July 2017.