PRODUCTS CENTER
the project is located in South Africa, an important manufacturing base of Benz in Africa. It is a comprehensive general contracting project integrating civil engineering and equipment supply, with a production capacity of 30JPH. Daimler INTEGRA6.0 standard is applied in the project for the first time worldwide. The concept of win-win cooperation is fully reflected in the project, and the first new three-dimensional warehouse in South Africa is built in collaboration with a team of professionals from around the world.
the project, located in Nomer, Illinois, is invested and constructed by Rivian, a newly established EV company, and the designed cycle time is 15JPH. The conveying lines, rain lines and line-edge common system for RPV model in the project are provided by our company, and the project has started production in May 2021. The variable supporting and lifting hanger system in the project can meet the production of commercial vehicles with different wheelbases.
the project is located in Tanjung Malim, Malaysia, with the designed cycle time of 36JPH. The working contents include main conveying lines (PBS line, trim line, chassis line, final line, etc.), auxiliary conveying lines (engine line, seat line, tire line, etc.), process equipment (engraving machine, manipulator, AGV, etc.), as well as commodity inspection lines and rain lines for the new General Assembly Shop. It is the largest overall workshop project of automobile factory in Malaysia in recent years, and also the first general contracting project that our company enters Malaysia.
the project is located in Gliwice, Poland, with the designed cycle time of 34JPH, which is the milestone project of our company for the first formal entry into the local European market. The main working contents include PBS line, trim line, chassis line, final line, engine combination assembly line, rain line and inspection line for the new General Assembly Shop. Among them, the combination assembly mode of engine tray mounted on hangers and the heavy-duty hangers bearing 6.4 tons are developed and applied in the project for the first time.