NIO Industrial Park: It has a construction area of about 720,000㎡. The complex geotechnical engineering issues on the site, such as multiple geomorphic units, thick fill soil and undulating bedrock, are accurately evaluated. According to the characteristics of all kinds of buildings and different geological conditions, the natural foundation, combined composite foundation, pile foundation and other solutions are put forward.
Yellow River Ecological Protection Exhibition Base Project: It is an important supporting facility of the Yellow River Ecological Reserve. We combined the UAV photogrammetry and GPS measurement to provide orthographs, digital line graphs and real 3D models of the project, as well as basic data for project planning and ecological protection design.
Geely Changxing New Energy Automobile Project: It has a construction area of 443,000㎡. The site is distributed with deep saturated soft soil. In the process of pile foundation construction, the technical problem of pile displacement caused by the increase of pore water pressure in saturated soft soil has been successfully solved by measures like making stress relief holes and trenches.
Luoyang New District Stadium Project: It is a stadium with 40,000 seats, and a landmark public building of Luoyang. The reverse slope gravity foundation scheme was creatively put forward to solve difficulties and achieve anti-pulling of the cable-stayed structure and wind load stability of the canopy. It won the provincial and ministerial excellent survey award.