GAC New Energy Vehicle Project: It has a construction area of 200,000m2, and the stratigraphic structure of the site can be found out accurately by means of drilling and in-situ testing. According to the characteristics of rocks and soils in various types, high groundwater level and large fluctuation of bedrock, natural foundation, rock-socketed pile, prestressed pipe pile and other foundation schemes are adopted for partition.
SGMW Chongqing Project: It has a construction area of 627,000㎡, and it is the site for deep excavation and high filling, with extremely complicated engineering geological conditions. Our institute has undertaken various geotechnical engineering services of the project, such as investigation, foundation treatment, pile foundation, deep foundation pit, high slope design and construction.
Phase I Project of Park Renovation and Upgrading of Sinosteel Group Luoyang Refractories Co., Ltd.: The park occupies an area of about 50,000㎡. New technologies, such as aerial photography and 3D laser scanning are used for digital measurement and 3D modeling of existing buildings to obtain BIM models of buildings and provide basic data, such as plane, elevation and sections for building reconstruction.
Datang Sanmenxia Power Plant Project: It is a 2×600MW supercritical and 1000MW ultra-supercritical generator unit project, and it is located in the collapsible loess region. Our institute adopts a variety of testing methods and means to test the effect of multiple foundation treatments.