PRODUCTS CENTER
the designed cycle time of the project is 60JPH. The project is the flagship experience plant prepared by GAC for the future electrification trend. For the first time, the project adopts the automatic combination assembly and tightening technology for chassis used by European automakers, and absorbs the concept of "rootless production" of Japanese lean production. The products include S, LX, V, Y and other models of AION series. The project started construction in July 2018 and the SOP began in May 2019.
the project is equipped with a series of tooling equipment with the highest standards of the industry such as the general assembly conveying system composed of lifting slide plate, EMS, annular slide plate and plastic plate chain. The automation and intelligence level is leading in China, and the technological level is in line with international luxury car brands. The production capacity is 10JPH and the project has been put into production in September 2016.
the project is constructed in accordance with the goal of "high efficiency, flexibility, intelligence and environmental protection". The designed cycle time is 60JPH. It adopts the lifting hanger system based on LJU independently developed by AE for the first time, and becomes the benchmarking general assembly shop with the most advanced process technology of CCAG after completion in August 2016.
the project is a sister project of the diversion high-end projects of Chongqing Chang'an undertaken by our company. The project is an upgraded version based on the success of Chongqing project. The local points of the project have been optimized and the designed cycle time is 53s.