General Assembly Conveyor Line Project of SAIC Ningde Base


it is to build an intelligent plant in accordance with the planning concept of "flexibility, digitization, automation and datamation", the new four modernization. The designed cycle time is 60JPH. The project meets the collinear flexible production of multiple models from two-seat A00 class to seven-seat full-size SUV/MPV, and initiates the integral combination assembly process with double inlets and double outlets to meet the process requirements for production with high cycle time;

关键词:

Category:

Complete Process Shop EPC

图片名称

咨询热线:

General Assembly Conveyor Line Project of SAIC Ningde Base

图文详情


Previous page

General Assembly Unit for General Contract Project of Shaanxi Automobile Commercial Vehicle Baoji Plant