
Project details
New General Assembly Shop Project for Retreating from Urban Areas and Shifting to Industry Zones of FAW Jiefang Liuzhou Branch
the production capacity is 20,000 units/year, and the products cover heavy, medium, light and mining trucks. In this project, for the first time, the heavy-duty three-dimensional warehouse is used to store the heavy truck solebars; the front assembly technology is used to complete the front and rear axle assembly of heavy trucks; the double heavy-duty AGV is used for chassis assembly of heavy trucks; the heavy-duty AGV is used to complete the cab interior assembly. Among them, the front assembly technology is the first to be used in China. It has been put into production on May 11, 2021.
关键词:
Category:
Commercial Vehicle Quality Project

咨询热线:
New General Assembly Shop Project for Retreating from Urban Areas and Shifting to Industry Zones of FAW Jiefang Liuzhou Branch
图文详情
Next page
Previous page
None
Next page
Copyright © AE CORP.