BBAC Shunyi GA Shop Assembly Line


Daimler's latest and most advanced plant with high flexibility and intelligence; the project is the general contracting of overall workshop equipment covering civil engineering, three-dimensional warehouse, process equipment and conveying line of the General Assembly Shop. The production capacity is 42JPH, and the products cover Benz passenger cars and electric vehicles. It has been put into production in September 2019.

关键词:

Category:

Complete Manufacturing Equipment EPC

图片名称

咨询热线:

BBAC Shunyi GA Shop Assembly Line

图文详情


Previous page

General Contract Project for General Assembly Conveyor System of SAIC Volkswagen MEB Plant