Shanghai Volkswagen Automotive Co., Ltd. Tianjin Branch warehouse expansion project second announcement

Number of visits: Date:2016-01-18

1. Project Overview
 
Shanghai Volkswagen Automotive Co., Ltd. Tianjin Branch warehouse expansion project is located 146 Nanhai Road, Tianjin Economic and Technological Development Zone, Shanghai Volkswagen Automotive Co., Ltd. Tianjin Branch of the existing plant in the region. Construction contents include: new logistics warehouses, oil Class C library, pump house, with a total construction area of ​​8897.5m2.
 
2, environmental impact and Preventive Measures
 
Construction period: Construction noise, construction dust, construction waste and other effects. Moisturizing take sprinkler dust; building insulation, noise reduction measures to control the construction time; after excavation and backfilling or construction waste removal and other measures in a timely manner, you can minimize the impact of the construction. Operation period: ① gas: gas pollution generated by the project operation period is mainly natural gas-fired boiler exhaust, soot and other kitchen. Natural gas belongs to clean energy, gas exhaust fumes of all pollutants, SO2, NOx emission rate, the emission concentration can meet the "air pollutant discharge standard" (GB16297-1996) Table 2 secondary standards; fumes from the kitchen through the top of the stove Exhaust Hood collected after fume purification facilities for processing, via a dedicated building at the top of the flue lead to emissions of soot emission concentration can be achieved, "cooking fume emission standards (Trial)" (GB18483-2001) standards. ② Wastewater: Wastewater pollution project operation period generated all sewage, where flushing, washing treated sewage discharged by septic tanks, grease trap after treatment by oily wastewater emissions. Efflux major pollutants in wastewater SS, COD, BOD5, ammonia, animal and vegetable oil, the concentration of total phosphorus emissions can meet "Integrated Wastewater Discharge Standard" (DB12 / 356-2008) three standard requirements, the municipal pipe network into Tianjin Economic and Technological Development Zone sewage treatment plant to focus, impact on the water environment is very small. ③ Noise: The project main noise source to the Treasury by fans and kitchen exhaust fume emission by fans and other operating noise, the noise source intensity is 70 ~ 80dB (A). After building insulation, less affected by the external environment. ④ Solid waste: mainly garbage workers, set up a dedicated container storage, handling by the local sanitation department.
 
3, environmental feasibility conclusions
 
Construction of the project in line with national and Tianjin industrial policy; set aside land for development site for the Shanghai Volkswagen Automotive Co., Ltd. Tianjin Branch, Tianjin Economic and Technological Development Zone, in line with land use planning. The project to produce gas, waste water, noise, solid waste and other pollutants are to take appropriate measures to control environmental management, solid waste disposal reasonable whereabouts, the project can achieve operational and regional pollutant discharge control requirements. The project in ensuring the effective implementation of environmental management measures and ensure that environmental investment in full under the premise of investment, have environmental feasibility.
 
4. Learn more about the form of project information
 
The public can obtain a copy of the "Shanghai Volkswagen Automotive Co., Ltd. Tianjin Branch warehouse expansion project environmental impact report Letters this" reading to learn more about the project EIA situation to the construction unit or EIA unit by telephone.
 
5, the scope for public comment and the main issues
 
The construction project will have a favorable or unfavorable impact on your life and affect the environment, and for your area. With this include: ① construction projects impact on your life; the impact of construction and operation of projects ② of your environment may cause; ③ your attitude and pollution prevention recommendations for the project construction.
 
6, the specific form for public comment
 
For more advice you can contact by phone, e-mail and other forms of environmental impact assessment and construction unit or units.
 
7, the public comments of the beginning and ending time
 
Please on March 6, 2013 to 2013 March 19 days, feedback public opinion, and to provide contact information so that feedback.
 
8, the construction unit and the EIA unit Information
Construction Unit: Shanghai Volkswagen Automotive Co., Ltd.
Contact: Mr. Song Phone: 13803077807
Email: [email protected]
EIA unit: Fourth Design and Research Institute of Machinery Industry
Contact: Ms. Yao
Tel: 13721641879
Email: [email protected]